![]() |
|
Products > Sub Floor Preparation
Sub Floor Preparation
Screed
Sub floor preparation is the key to ensure a superior final finish. Durham Flooring uses the highest quality screeds and primers, This combined with skilled application will ensure that your flooring project receives the best preparation methods available. The pictures below show a screed application in process.
Damp Proof Membranes Damp proof membranes are available where damp issues occur or are a possibility. Durham Flooring will provide a free consultation and carry out protimeter moisture measurement reading. This assesses moisture conditions in buildings to aid understanding of how and why damp conditions may prevail and test the suitability of the floor and whether a damp proof membrane is appropriate.
|
| Copyright ©2008 Durham Flooring. All Rights Reserved. Durham Flooring - Flooring Contractors | Contract Flooring | Commercial Flooring - North East England, UK. |